Ameen, J R M, Neale, R H and Abrahamson, M (2003) An application of regression analysis to quality a claim for increased costs. Construction Management and Economics, 21(02), 156-65.

  • Type: Journal Article
  • Keywords: cost estimation; regression analysis; claim; earth-moving works; efficiency
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/0144619032000049683
  • Abstract:

    This paper is a case study of the use of multiple linear regression analysis to quantify a claim for extra payment to a subcontractor for work on a substantial construction earth-moving project. The basis of the claim was that the client and main contractor required the work to be executed in ways other than that originally planned by the subcontractor, reducing efficiency and so increasing costs. The authors of this paper represented the earth-moving subcontractor in a legal arbitration, in which this application of multiple linear regression analysis was fundamental to quantifying the amount claimed in the case. The analysis determined the time required to perform earth-moving tasks, based on a set of explanatory variables, using data sets recorded on-site. The same equation was then applied to the plan of work used for the tender and was used to show that the comparative efficiency between tender and actual was as low as 25%. The claim was successful, and the calculations described in this paper were used to quantify a total additional payment of approximately £380,000.

Arditi, D and Lee, D-E (2003) Assessing the corporate service quality performance of design build contractors using quality function deployment. Construction Management and Economics, 21(02), 175-85.

Dainty, A R J, Cheng, M-I and Moore, D R (2003) Redefining performance measures for construction project managers: an empirical evaluation. Construction Management and Economics, 21(02), 209-18.

Ekstrom, M A, Bjornsson, H C and Nass, C I (2003) Accounting for rater credibility when evaluating AEC subcontractors. Construction Management and Economics, 21(02), 197-208.

Fox, S (2003) A matrix to indicate the utility of technologies. Construction Management and Economics, 21(02), 187-96.

Liu, A M-M (2003) The quest for quality in public housing projects: a behaviour to outcome paradigm. Construction Management and Economics, 21(02), 147-58.

Myers, D (2003) The future of construction economics as an academic discipline. Construction Management and Economics, 21(02), 103-6.

Ofori, G (2003) Preparing Singapore's construction industry for the knowledge-based economy: practices, procedures and performance. Construction Management and Economics, 21(02), 113-25.

Picken, D H and Ilozor, B D (2003) Height and construction costs of building in Hong Kong. Construction Management and Economics, 21(02), 107-11.

Rooke, J D, Seymour, D E and Fellows, R F (2003) The claims culture: a taxonomy of attitudes in the industry. Construction Management and Economics, 21(02), 167-74.

Roy, R, Brown, J and Gaze, C (2003) Re-engineering the construction process in the speculative house building sector. Construction Management and Economics, 21(02), 137-46.

Shohet, I M, Lavy-Leibovich, S and Bar-On, D (2003) Integrated maintenance monitoring of hospital buildings. Construction Management and Economics, 21(02), 219-29.

Tang, Y H and Ogunlana, S O (2003) Modelling the dynamic performance of a construction organization. Construction Management and Economics, 21(02), 127-36.